Skip to content

Migration and upgrades

Move to Next.js with a plan for your search traffic

Replatforming, version upgrades and takeovers of existing Next.js code. Search rankings can move during any migration. We plan to reduce that risk and watch traffic afterwards, but nobody can rule it out.

In short: migration and upgrades

Replatform from WordPress, Webflow, Wix or custom stacks, upgrade old Next.js versions, or hand over an existing codebase.

Choose it when
An existing site has to move or catch up
Timeline
Set in your proposal, then 30 days of traffic monitoring
Price
Quoted after scoping

The problem

Why teams put off moving, and what it costs them

A migration is easy to postpone because the old site still loads. The risk builds while it waits.

  • The platform limits what you can do

    Page speed, layout or integrations are capped by a theme, a plugin set or a site builder, and each workaround adds another thing to maintain.

  • The Next.js version has fallen behind

    Unsupported versions stop receiving security fixes, and the longer an upgrade waits, the more changes it has to absorb at once.

  • The person who built it has gone

    Nobody is sure how it is deployed, where the secrets are kept or whether a backup can be restored.

  • Existing search traffic could be lost

    If old addresses stop working, or titles and descriptions are dropped, search engines and visitors lose their way to your pages.

Version support

Is your Next.js version still supported?

Position on 27 November 2026. Security releases for 15.x continue through 31 January 2027, so plan that upgrade now.

Next.js version support status
VersionStatusWhat it means for you
16.xActive LTS, released 21 October 2025The long-term support line to be on
15.xMaintenance LTSSecurity releases continue through 31 January 2027
14.x and olderUnsupportedUpgrade

Source: Next.js support policy.

Why upgrades cannot always wait

On 3 December 2025 a flaw rated CVSS 10.0, the top of the severity scale, was published. It could allow remote code execution (an attacker running their own code on your server) in unpatched Next.js 15.x and 16.x apps using the App Router, and in 14.3.0-canary.77 and later canary (pre-release) versions. Upgrading was the only fix.

Source: Next.js advisory for CVE-2025-66478.

Fit

Who this is for

  • Sites on WordPress, Webflow, Wix or a custom stack

    You want to move to Next.js and bring your content and search presence with you.

  • Next.js sites on the Pages Router

    You want to move to the App Router, either in one project or in planned stages.

  • Next.js sites on an old major version

    You need to get back onto a supported release.

  • Teams whose developer has left

    You have a Next.js codebase and need someone to take responsibility for it.

Probably not the right fit if

  • You need a guarantee that rankings will not change. No honest provider can give one.
  • You want to move to a platform other than Next.js. We will refer you on.
  • You only need repairs to a WordPress, Webflow or Wix site that is staying where it is.

Included

What is included

The first group is part of every migration. The others depend on where you are starting from.

In every migration

The work that protects visitors and search traffic.

  • A URL map: every existing page address and where it goes next
  • Permanent redirects (301, or the equivalent 308) so old addresses forward to the new ones
  • Transfer of metadata, such as page titles and descriptions
  • 30 days of traffic monitoring after launch

Replatforming

From WordPress, Webflow, Wix or a custom stack to Next.js.

  • Content moved into a headless CMS or Markdown files
  • Templates rebuilt in Next.js, keeping the current design or following an agreed new one
  • Forms, analytics and other integrations listed at scoping and reconnected
  • Training for the people who will edit content

Pages Router to App Router

Next.js has two systems for organising pages. The App Router is the newer one.

  • Both can run in one project, so routes can move in stages
  • Data loading, layouts and metadata rewritten for the App Router
  • Each moved route checked on a preview link before it replaces the old one

Major version upgrades

For example, moving to Next.js 16, which needs Node.js 20.9 or later and changes several APIs.

  • Framework and dependency upgrades, with breaking changes worked through
  • Replaced or removed features handled, such as the middleware file now being named proxy
  • Build, lint and type checks restored where the upgrade affects them
  • Testing on a preview deployment before production

Taking over an existing codebase

The order we work in when we inherit a Next.js site.

  • Collect access to the repository, hosting, domain, CMS and analytics.
  • Run an audit and confirm there is a backup that can be restored.
  • Fix critical security and uptime risks first.
  • Document setup, environments and known issues.
  • Start the care plan once the site meets a minimum safe baseline.

Not included

What is not included

A migration moves a site. These are separate pieces of work.

A ranking or traffic guarantee
Search rankings can move during any migration, up or down. We commit to the redirects, the metadata transfer and the monitoring.
A redesign or new content, unless scoped
Changing design, structure and platform at once makes problems harder to trace. If you want all three, we price and plan them explicitly.
New features
Features the old site does not have are quoted as development work.
Ongoing care and SEO
Ongoing patching and changes need a care plan. Ongoing search work needs an SEO retainer.
Third-party fees
Third-party costs such as hosting, domains, CMS and email services are paid by you directly.

Process

Process and timeline

The timeline is written into your proposal, because it depends on how many pages, integrations and surprises there are. A Growth Site package, which includes migration, usually takes 5–8 weeks. Traffic monitoring continues for 30 days after launch.

  1. Scoping

    Inventory

    List pages, current addresses, integrations and risks. For an upgrade or takeover, review the code and dependencies.

    From you
    Read access to the site and analytics, and to the repository if there is one
    Moves on when
    Written scope
  2. Scoping

    Proposal

    A fixed price, timeline, exclusions and quality targets.

    From you
    Signature and deposit
    Moves on when
    Agreement signed
  3. Before building

    URL map and metadata

    Match every existing address to its destination, and record titles and descriptions to carry over.

    From you
    Decisions on pages to merge or retire
    Moves on when
    Map approved
  4. Project

    Build and move content

    Build on preview links with a weekly written update. Your current site stays live meanwhile.

    From you
    Content decisions and third-party access
    Moves on when
    Feature complete
  5. Before launch

    Launch checks

    Test redirects against the URL map, then SEO, accessibility, performance, security and forms.

    From you
    Your own acceptance testing
    Moves on when
    Checklist passed
  6. Launch day

    Launch

    Deploy, switch on redirects and submit the new sitemap.

    From you
    Go-ahead and DNS access (control of where your domain points)
    Moves on when
    Live and stable
  7. 30 days after launch

    Monitor

    Watch traffic and broken addresses, compare with the position before launch, and correct what we find.

    From you
    Analytics and Search Console access kept open
    Moves on when
    Handover accepted

How we work, including working agreements

Proof

Work you can check

Case study: our own site

Rebuilding our own website

This was a reorganisation of our own site, not a move from another platform or a client project. It shows the approach: restructured pages, redirects from retired addresses, and sitemap and metadata generated from code.

Performance results will be added once they have been measured on the live site.

Read the case study

Price

Quoted after scoping

Migration and upgrades
Quoted after scoping
Growth Site, migration included
From ₹3,50,000 / $6,000
Growth Site timeline
5–8 weeks
  • The quote depends on the number of pages and addresses, the source platform, the amount of content, integrations and the condition of any existing code.
  • Growth Site scope: Up to 25 pages or templates, CMS, blog, integrations and migration.
  • Projects are billed 40% to start, 30% at design approval and 30% before launch.
  • The audit fee is credited against a build or care plan.
  • Third-party costs such as hosting, domains, CMS and email services are paid by you directly.
  • GST is added where applicable.

Questions

Questions about migrating

Will we lose search traffic?

You might see movement. Rankings can change during any migration while search engines process new addresses and pages. A URL map, permanent redirects, metadata transfer and 30 days of monitoring reduce the risk and help us spot problems early. They do not remove it.

Does our current site stay online while you work?

The new site is built on separate preview links. Your current site keeps serving visitors until you approve the launch.

How is a migration priced?

It is quoted after scoping. What changes the price: the number of pages and templates, the source platform, the amount of content, integrations, how far behind the code is and how well it is documented. The Growth Site package, from ₹3,50,000 / $6,000, includes migration within its scope.

We are on Next.js 15. Do we need to do anything?

Plan an upgrade. Security releases for 15.x continue through 31 January 2027. Next.js 16 is the Active LTS (long-term support) line. The support dates and source are listed on this page.

Do we have to leave the Pages Router?

Not necessarily. Next.js 16 still includes the Pages Router, so a version upgrade and a router migration are separate decisions. We will say which is worth doing now.

Can you take over a site someone else built?

Yes, for Next.js sites. We collect access, audit the code and confirm a backup can be restored, fix critical security and uptime risks first, document the setup, and then start a care plan.

Can our team edit content afterwards?

Yes, where content management is in scope. Content moves into a headless CMS or Markdown files, and we train the people who will edit it.

Tell us what you are moving from

Share the current site and the reason for moving. We will say what needs scoping before anyone can quote it responsibly.

We reply within 1 business day. Hours: Monday to Friday, 10:00–18:00 IST, except public holidays in Karnataka.